Header menu link for other important links
X
Influence of early temperature rise on movements and stress development in concrete decks
, J. Kunin, R. Curtis, D. Streeter
Published in
2010
Volume: 15
   
Issue: 1
Pages: 108 - 116
Abstract
The primary focus of this paper is to develop an understanding of temperature changes introduced by hydration heat release in the first few hours after casting in the thermal movements and stresses of the concrete deck and girders. Temperature and strain measurements from a simply supported, single-span, steel girder bridge with a composite concrete deck are presented. It is shown that setting occurs during the temperature rise and partial strain compatibility between steel girder and concrete deck is initiated at the end of the concrete temperature rise. Full strain compatibility between concrete deck and steel girder is achieved at the end of the cooling period following the initial temperature rise. The stresses in the steel girder associated with temperature changes are interpreted using an analytical model. It is shown that the concrete deck gains sufficient stiffness at the end of the temperature rise to restrain the movement of the top flange. Concrete deck movement in the period associated with cooling following the initial temperature rise is restrained, which could potentially produce tensile stress in concrete. The magnitude of tensile stress at the end of the cooling period depends upon the difference in the temperatures of the concrete deck and top flange and on the temperature gradient in the steel girder at the end of the heating period. © 2010 ASCE.
About the journal
JournalJournal of Bridge Engineering
ISSN10840702